Walking down the road ready to see our house build sites and to meet our families.
Unloading materials at house build site 3 (Toval Morales Family).
The concrete pads were poured and ready for us to begin work.
At each site the teams met their families and had a time of prayer before beginning work.
Painting the drywall at House build site 2. So much painting. So many colors!
Learning new skills.
Walls started to go up.
Lunch was very welcome when it arrived!
At the end of our work day, all the supplies had to be carried inside. We finished up rather grimier than we began, wet, tired, and thirsty, but thrilled with what had been accomplished.
After swimming and showering we headed to a local restaurant where the kind staff prepared a special dessert to celebrate Matayo's 16th birthday.